# Waste 1.1 Building Re-Use

# Applies to

All development

# Objective

To ensure waste avoidance, reuse and recycling during the design and construction stages of development.

# Summary

Points are awarded when the development is on a site that has been previously developed and at least 30% of the existing building been re-used. This can include retention of existing dwelling/s when adding dwellings to a site.

If your site has not been previously developed, then this credit is not applicable and should be scoped out.

# Documentation & evidence required

  • Site and floor plans showing the total existing building area prior to any changes and the existing retained area in the new proposal.
  • Provide calculations that demonstrate the percentage of the existing building being retained.

# Further Information